Not legal advice. No template is compliant out of the box. A SWMS has to be made site-specific with the workers doing the job before work starts. SWMS Kit is not a regulator.

Sample filled page

SAMPLE — not a completed SWMS. Watermarked. The yellow fields below are an example business, not yours.

First page of SWMS 01 Energised Electrical Work showing the header block and site-specific checklist
SWMS 01 — header block and the make-it-site-specific checklist.

SAMPLE

SWMS 01 — Energised electrical work (Model WHS)

Company: Example Electrical Pty Ltd

ABN: 12 345 678 901

Workplace: 18 Example Street, Parramatta NSW

Principal contractor: Example Constructions

Site hazards: live consumer mains in a cupboard that cannot be isolated without the distributor. Neighbours still in the other unit.

Task: Isolate, lock out and tag out. Hazard: someone else re-energises. Control: one lock per person. Who: works supervisor.