Not legal advice. No template is compliant out of the box. A SWMS has to be made site-specific with the workers doing the job before work starts. SWMS Kit is not a regulator.

Kit library

21 documents. Model WHS for NSW, QLD, SA, TAS, ACT, NT and WA. Victorian OHS is its own file, not a header swap. Your state is set to NSW, which uses the model set when you run the wizard.

  • WHSSWMS 01 — Work on or near energised electrical installations and services (Model WHS)

    The SWMS for work on or near live electrical installations — the high risk construction work category that, on its own, means a SWMS is required before the job starts.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 01 — Work on or near energised electrical installations and services (Victorian OHS)

    The SWMS for work on or near live electrical installations — the high risk construction work category that, on its own, means a SWMS is required before the job starts.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 02 — Electrical work at heights: ladders, scaffolds, EWP / scissor lift (Model WHS)

    Ladders, scaffolds and elevating work platforms for electrical work where a person could fall more than 2 metres.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 02 — Electrical work at heights: ladders, scaffolds, EWP / scissor lift (Victorian OHS)

    Ladders, scaffolds and elevating work platforms for electrical work where a person could fall more than 2 metres.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 03 — Switchboard installation, upgrade and energised testing (Model WHS)

    New boards, upgrades and the testing that has to happen when a board is energised — including old boards that may contain asbestos.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 03 — Switchboard installation, upgrade and energised testing (Victorian OHS)

    New boards, upgrades and the testing that has to happen when a board is energised — including old boards that may contain asbestos.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 04 — Cable trenching and work near underground services (Model WHS)

    Trenches and excavation for cables, including work near underground electrical, gas and other services, and silica from cutting or chasing.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 04 — Cable trenching and work near underground services (Victorian OHS)

    Trenches and excavation for cables, including work near underground electrical, gas and other services, and silica from cutting or chasing.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 05 — Ceiling spaces and confined/restricted spaces (incl. asbestos awareness and heat) (Model WHS)

    Ceiling spaces that may be confined or restricted, with asbestos in old buildings and heat that changes the job in summer.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 05 — Ceiling spaces and confined/restricted spaces (incl. asbestos awareness and heat) (Victorian OHS)

    Ceiling spaces that may be confined or restricted, with asbestos in old buildings and heat that changes the job in summer.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 06 — Solar PV installation on roofs (Model WHS)

    Roof-mounted solar PV: falls, DC that stays live in daylight, and heat on the roof.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 06 — Solar PV installation on roofs (Victorian OHS)

    Roof-mounted solar PV: falls, DC that stays live in daylight, and heat on the roof.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 07 — Temporary construction site power and wiring (Model WHS)

    Temporary supplies, builders' poles and site wiring around plant and other trades.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 07 — Temporary construction site power and wiring (Victorian OHS)

    Temporary supplies, builders' poles and site wiring around plant and other trades.

    Start a project to duplicate this into a job.

    About this SWMS

  • WHSSWMS 08 — Strip-out, demolition-adjacent electrical work and rewiring (Model WHS)

    Making electrical installations safe for strip-out and demolition, and rewiring in buildings that are coming apart.

    Start a project to duplicate this into a job.

    About this SWMS

  • VICSWMS 08 — Strip-out, demolition-adjacent electrical work and rewiring (Victorian OHS)

    Making electrical installations safe for strip-out and demolition, and rewiring in buildings that are coming apart.

    Start a project to duplicate this into a job.

    About this SWMS

  • DOCToolbox talk templates (5 talks)

    Start a project to duplicate this into a job.

  • DOCSWMS register

    Start a project to duplicate this into a job.

  • DOCDaily sign-on sheet

    Start a project to duplicate this into a job.

  • DOCSite-specific in 10 minutes

    Start a project to duplicate this into a job.

  • DOCRead me first

    Start a project to duplicate this into a job.