Electrician SWMS Kit · SWMS 07
Temporary construction site power and wiring
Temporary supplies, builders' poles and site wiring around plant and other trades.
Ships as two files: Model WHS (NSW, QLD, SA, TAS, ACT, NT, WA) and a Victorian OHS version. Energised electrical work, and often powered mobile plant. Model (k) and (o). Victorian 7 and 4. Not compliant until you make it specific to the site with the workers doing the work.

What the task table covers
- Plan the temporary supply. Overloaded leads, unprotected outlets, leads through water
- Install and alter site wiring. Live work because the site 'cannot lose power', contact with plant
- Inspect before each use. Damaged sheath, missing RCD, home-made joints
- Remove the temporary installation. Left live after the job, or removed while someone is still using it